Flint Public Library

September 9, 2008

August 18, 2008

Filed under: (v) August 2008 — flintlibrary @ 9:42 pm

Erecting shelving in children’s and adult areas.

August 7, 2008

Filed under: (v) August 2008 — flintlibrary @ 9:38 pm

Laying of brick at main entrance.

July 1, 2008

Filed under: (u) July 2008 — flintlibrary @ 9:23 pm

Removal of stained glass windows for restoration.

July 9, 2008

June 25, 2008

Filed under: (t) June 2008 — flintlibrary @ 10:19 pm

Laying asphalt in main parking lot.

Laying asphalt in upper parking lot.

June 12, 2008

Filed under: (t) June 2008 — flintlibrary @ 10:16 pm

Finishing touches being added to library addition.

Planting trees and shrubs.

June 9, 2008

June 5, 2008

Filed under: (t) June 2008 — flintlibrary @ 11:11 pm

Staining/finishing wood trim in addition.

Installing new hardwood floor in original library.

May 28, 2008

Filed under: (s) May 2008 — flintlibrary @ 11:06 pm

Painting walls and ceilings of original library.

New hardwood floors in original library (beautiful!).

May 19, 2008

Filed under: (s) May 2008 — flintlibrary @ 11:00 pm

Installed wood trim around windows.

An electrician from our very own town of Middleton hard at work wiring the new addition.

A fresh coat of paint.

May 19, 2008

May 13, 2008

Filed under: (s) May 2008 — flintlibrary @ 11:09 pm

Plastering mezzanine area of new building.

Scraping and sanding floors in original library.

May 8, 2008

May 8, 2008

Filed under: (s) May 2008 — flintlibrary @ 10:34 pm

Wood trim around windows in library addition.

Grouting walls and floors in restrooms.

Placing concrete for sidewalks.