Erecting shelving in children’s and adult areas.
Laying of brick at main entrance.
Removal of stained glass windows for restoration.
Laying asphalt in main parking lot.
Laying asphalt in upper parking lot.
Finishing touches being added to library addition.
Planting trees and shrubs.
Staining/finishing wood trim in addition.
Installing new hardwood floor in original library.
Painting walls and ceilings of original library.
New hardwood floors in original library (beautiful!).
Installed wood trim around windows.
An electrician from our very own town of Middleton hard at work wiring the new addition.
A fresh coat of paint.
Plastering mezzanine area of new building.
Scraping and sanding floors in original library.
Wood trim around windows in library addition.
Grouting walls and floors in restrooms.
Placing concrete for sidewalks.
Theme: Rubric. Blog at WordPress.com.
Get every new post delivered to your Inbox.