Flint Public Library

May 7, 2008

May 5, 2008

Filed under: (s) May 2008 — flintlibrary @ 10:51 pm

Installing mezzanine ceiling panels in original library.

New paint in the new library.

April 29, 2008

Filed under: (r) April 2008 — flintlibrary @ 10:39 pm

Staining of wood trim for first floor area.

Installing wood window trim.

April 28, 2008

April 24, 2008

Filed under: (r) April 2008 — flintlibrary @ 9:46 pm

Reconstructing chimney.

Applying first coat of paint in new Children’s Room area.

April 23, 2008

April 17, 2008

Filed under: (r) April 2008 — flintlibrary @ 9:35 pm

Installing windows in library addition.

Constructing office space in new Children’s Room.

April 14, 2008

April 9, 2008

Filed under: (r) April 2008 — flintlibrary @ 11:26 pm

Exterior and interior of library addition.

April 8, 2008

Filed under: (r) April 2008 — flintlibrary @ 11:19 pm

Scraping and prepping walls in original library. (pictured: Wall where photocopier was located)

April 4, 2008

Filed under: (r) April 2008 — flintlibrary @ 11:16 pm

Working on entrance from original library into new addition.

Installing metal stud framing and drywall.

Working on area for new parking lot.

Elevator shaft.

April 3, 2008

April 1, 2008

Filed under: (r) April 2008 — flintlibrary @ 9:44 pm

The (beautiful!) library addition, as it nears completion.
fpl-4-1-08-1.jpg

March 27, 2008

March 25, 2008

Filed under: (q) March 2008 — flintlibrary @ 10:17 pm

Installing shingles on roof.
fpl-3-25-08-011.jpg

Backfilling soil for parking lot.
fpl-3-25-08-016.jpg

March 21, 2008

Filed under: (q) March 2008 — flintlibrary @ 10:12 pm

Installation of windows at entrance.
fpl-3-21-08-002.jpg

Installing drywall on ceiling and walls.
fpl-3-21-08-008.jpg

fpl-3-21-08-011.jpg