Installing mezzanine ceiling panels in original library.

New paint in the new library.


Staining of wood trim for first floor area.

Installing wood window trim.

Exterior and interior of library addition.


Scraping and prepping walls in original library. (pictured: Wall where photocopier was located)

Working on entrance from original library into new addition.

Installing metal stud framing and drywall.

Working on area for new parking lot.

Elevator shaft.

Installing shingles on roof.

Backfilling soil for parking lot.

Installation of windows at entrance.

Installing drywall on ceiling and walls.

